• HOME
  • ABOUT
  • PROJECTS
  • NEWS & EVENTS
  • Athar Lina | Resources
  • CONTACT
  • English (en)English
  • العربية (ar)العربية
  • HOME
  • ABOUT
  • PROJECTS
  • NEWS & EVENTS
  • Athar Lina | Resources
  • CONTACT
Nov 2013
- Apr 2014
Conservation and rehabilitation
COMPLETED
REHABILITATION OF AN EARLY 20TH CENTURY BUILDING INTO A COMMUNITY CENTER
November 2013 – April 2014; Private donations.   Athar Lina has conducted basic cleaning, crack repair, tiling, plaster, ...
img
About The Project

November 2013 – April 2014; Private donations.

 

Athar Lina has conducted basic cleaning, crack repair, tiling, plaster, electricity and plumbing works in collaboration with the people of al-Khalifa.

The 150 square meter building was re-opened as a community centre in 2014. The space hosts a cultural program for architects and urbanists, and a social program for the community. The cultural program includes lectures, seminars, workshops and exhibitions. The community program includes heritage education for children, youth and women, public health, craft and design activities.

This building is the anchor space for al-Khalifa Summer Camp and for the educational activities offered to al-Khalifa children. All activities for the benefit of the neighbourhood children are offered free of charge.


SPONSORS

RELATED PROJECTS
img
AL-SHURAFA’ SHRINE CONSERVATION PROJECT
December 2019 – March 2021; funded by the American Research Centre in Egypt   Al-Shurafa’ shrine is one of the forgotten ...
ONGOING Dec 2019 - Mar 2021
Conservation and rehabilitation
Nov 2013
- Apr 2014
Conservation and rehabilitation
COMPLETED

SPONSORS

RELATED PROJECTS
img
AL-IMAM AL-SHAFI’I DOME CONSERVATION PROJECT
January 2016 – April 2021; funded by the US Ambassadors’ Fund for Cultural Preservation, with additional funding from the US Embassy in ...
ONGOING Jan 2016 - Apr 2021
Conservation and rehabilitation
REHABILITATION OF AN EARLY 20TH CENTURY BUILDING INTO A COMMUNITY CENTER
November 2013 – April 2014; Private donations.   Athar Lina has conducted basic cleaning, crack repair, tiling, plaster, ...
img
About The Project

November 2013 – April 2014; Private donations.

 

Athar Lina has conducted basic cleaning, crack repair, tiling, plaster, electricity and plumbing works in collaboration with the people of al-Khalifa.

The 150 square meter building was re-opened as a community centre in 2014. The space hosts a cultural program for architects and urbanists, and a social program for the community. The cultural program includes lectures, seminars, workshops and exhibitions. The community program includes heritage education for children, youth and women, public health, craft and design activities.

This building is the anchor space for al-Khalifa Summer Camp and for the educational activities offered to al-Khalifa children. All activities for the benefit of the neighbourhood children are offered free of charge.

ERROR: There is a problem with this subscription

Please can you try again later, or simply can you try to subscribe with another email address!

Success: Your subscription has been confirmed

You've been added to our list and will hear from us soon, thank you for your subscription.

ERROR!!

Please enter a valid email address
ABOUT

Athar Lina is a participatory conservation initiative that aims to establish modalities of citizen participation in heritage conservation based on an understanding of the monument as a resource not a burden.

LOCATION
JOIN OUR NEWSLETTER

© 2025 ATHAR LINA. All rights reserved.